Not all water pickup is equal — a shop vac and a truck-mount extraction unit produce very different outcomes on the same flooded room.
Moisture meters and documented extraction logs come standard on every Water Extraction job we run in Waite, ME.

Our Waite, ME truck-mount units pull significantly more water per hour than portable extraction gear.
We identify the contamination category before extraction to determine the correct safety protocol.
Saving original hardwood is possible with the right extraction method applied quickly.
Every Water Extraction job in Waite, ME comes with moisture readings logged before, during, and after extraction.
Getting water out is only useful if it's done with the right classification and the right tools — here's our Waite process.

Truck-mount capacity lets us clear a flooded room significantly faster than portable units alone.
Water is tested and classified as Category 1, 2, or 3 before extraction protocol is finalized.
Carpet and pad get separately assessed — pad usually can't be saved, but carpet often can with fast, thorough extraction.
We monitor injection drying progress with moisture meters calibrated for wood species.
Subfloor moisture often hides beneath flooring that looks dry on the surface.
Every job closes with a written extraction report showing before-and-after moisture readings.
A quick call helps us determine truck-mount versus portable equipment needs before we arrive.
Equipment is pre-loaded based on dispatch notes, so there's no delay on arrival.
You'll know the classification and cost before work starts.
Verification data backs every closed Water Extraction file in Waite, ME.

"They saved our hardwood floor with an injection drying method instead of ripping it all out. Saved us thousands." — Owen R.
"The moisture readings they gave us before and after made the whole process feel legitimate, not just a guess." — Bianca V.
"Truck-mount extraction cleared our flooded basement way faster than the shop vac approach a different company tried first." — Malik J.
A basic pump-out skips classification testing and moisture documentation that Water Extraction includes.
We'll assess whether injection drying is viable before recommending tear-out.
Category 1 is clean water, Category 2 is gray water with some contamination, and Category 3 is sewage or blackwater requiring full PPE.
Yes, every job includes a written report with before-and-after moisture readings.
Extraction within the first few hours significantly improves the odds of saving flooring materials.
Documented reports are standard and can be provided directly to your adjuster on request.
If you're in or near Waite, an extraction crew can typically respond the same day.

Speak with a real Waite, ME technician, not an automated system.
Call +1-844-578-1604